BOLTON
TENNANT STORAGE MEZZANINE FLOOR
Storage Mezzanine Floor For Busy Warehouse In Bolton
THE CHALLENGE
Tennant, a leading supplier in the industrial cleaning and hygiene sector, faced a major space challenge at their Bolton facility. Their existing workshop was operating at full capacity, leaving no room for expansion or additional storage.
They needed a storage mezzanine floor solution that would instantly increase usable space, without the disruption and cost of relocating. The project was especially complex: one new mezzanine floor had to be built over an active workshop area, while another required extending an existing mezzanine and incorporating brand-new shelving both above and below for parts storage.
On top of that, Tennant wanted an end-to-end fit-out service including electrics, suspended ceiling, lighting, and safety features—all seamlessly integrated.
THE SOLUTION
Nexus Workspace designed and delivered a complete fit-out that combined two mezzanine structures with tailored storage solutions:
New Storage Mezzanine Floor over Workshop: Installed directly above the active workshop, this strong, load-bearing mezzanine doubled the available floor area while maintaining full working headroom below.
Extended Mezzanine with Integrated Shelving: By extending an existing mezzanine and fitting new shelving systems above and below, we maximised storage density and improved parts organisation.
Alongside the mezzanine build, Nexus provided:
Electrical installation & LED lighting for safe, well-lit environments.
Suspended ceiling to improve insulation, fire performance, and acoustic comfort.
Shelving systems designed for accessibility, durability, and efficient stock management.
Full safety integration including handrails, staircases, and edge protection.
“The real challenge was building a storage mezzanine floor above an active workshop without disrupting Tennant’s operations. Careful planning and phased installation meant we kept downtime to a minimum.” — Project Manager, Nexus Workspace
WHY THEY CHOSE NEXUS
Tennant needed a partner who could deliver everything under one roof—from structural steelwork to shelving, lighting, and finishes.
“We chose Nexus because they could manage the entire storage mezzanine floor project end-to-end. Their past projects showed a level of detail and finishing that gave us real confidence.” — Operations Manager, Tennant
Our ability to provide design, build, and fit-out services as a single package made the process smoother, faster, and more cost-effective.
GET A QUICK QUOTE
THE RESULTS
The completed project transformed Tennant’s facility:
Capacity doubled: The new storage mezzanine floor increased usable space by almost 100%.
Organised storage: With shelving above and below, parts and consumables are now quicker to locate and safer to handle.
Better working environment: New lighting, ceilings, and finishes improved both safety and staff comfort.
Minimal disruption: Careful scheduling ensured workshop operations continued throughout.
“The results have exceeded our expectations. Our new storage mezzanine floor gives us the capacity to grow without moving premises, and the shelving systems make day-to-day operations far more efficient.” — Operations Manager, Tennant”
Client