Project archive · Burnley · 2019
Space for production.
Above and below.
A 500-square-metre mezzanine and small production office for VEKA, forming part of the fit-out of an additional warehouse.
Discuss your production space
01 · The brief
Preparing an additional warehouse.
VEKA manufactures PVC-U window, door and conservatory systems. The project recorded here supported expansion into another warehouse near its existing Burnley premises.
The proposed facility included a 500-square-metre mezzanine with a small office on the upper level, and production accommodation above and below. Before the frame could be installed, the support conditions needed to be addressed through specialist foundation work.
Historical project record, first published in February 2019 and subsequently illustrated with progress and completion photography. The eight-week diary and specific construction details relate to this project, not a standard design or installation programme.
02 · The construction diary
Support first. Structure next.
Weeks one and two · Foundation work
A specialist piling contractor completed the required support works at the proposed column locations before mezzanine erection began. The original diary records opening the existing concrete floor to carry out those works.
The important project lesson is to establish the support requirements before manufacture and installation. Piling is one project-specific solution, not a routine requirement for every mezzanine or a substitute for engineering assessment.
Weeks three to five · Frame and deck
The steelwork was delivered and installed, followed by the secondary members and decking. The frame was coordinated, levelled and completed as part of the contractor's planned sequence.
Weeks six and seven · Access, office and protection
The project included guarding to exposed edges, three staircases and a pallet gate. The small production office was formed on the upper level using partition framing and plasterboard.
Suspended ceilings, fascia and column cases formed part of the specified protection and completion works beneath and around the mezzanine. Their design belonged to this facility and should not be copied as a general fire specification.
Week eight · Finishing the facility
Suspended ceiling work was completed and VEKA's electricians finished the required lighting. Carpet tiles and final decoration completed the production office. The original update recorded the premises as ready for VEKA to move in its machinery.
03 · The original record
Watch the transformation.
- Watch the project progress video, covering the transition from foundation work to steel installation.
- Watch the client case study, featuring Beth Yewlett, identified in the original record as Deputy Maintenance Manager.
The gallery below retains the original foundation, construction and completion photographs in their original sequence.
Explore our industrial mezzanine floor service and the slab information to gather before developing a production-floor brief. HSE's commercial client duties guidance explains responsibilities for a new project.