CONSTRUCTING A MEZZANINE FLOOR INTO A BUSY WAREHOUSE

We answer the questions business owners have when they are looking to install a mezzanine floor solution into their busy warehouse.

CONSTRUCTING
YOUR
MEZZANINE
SPACE

‘How much will this disrupt my business?’, ‘How will you protect my machinery?’ ‘How will you ensure the health and safety of my employees during the construction?’ These are all common questions we receive from our potential clients when they are looking to install a mezzanine floor into their busy warehouse.

We thought we’d try and answer those questions and more as much as we can below, so that you are as informed as much as possible before you get in touch with us.

Open Plan Office For Move Dance
Storage Mezzanine Floor

BUILD CONSIDERATIONS

MINIMISING DOWNTIME

We understand that downtime costs money and is not an option for most of our clients. Often the mezzanine floor is been built over the entirety of a warehouse and they have nowhere to go. This is where detailed planning and scheduling comes into place.

We would work closely with you to write a detailed programme which details clearly how we would implement the build. Building a mezzanine floor requires a degree of flexibility from both parties but we would issue clear instructions as to what areas we need to be clear and when.

THE BUILD
ITSELF

Often the best way to construct a mezzanine floor in this situation is over weekends or evening. We can build a mezzanine floor over consecutive weekends which allows you to function without disruption.

Depending on the size of the floor, we could build the steel work over the first weekend, install the decking on the second weekend, and then install the ceilings and electrics over the weekends that follow.

TEMPORARY MEASURES

Whilst the mezzanine floor is been installed we would install both temporary lighting and netting underneath the mezzanine floor if you required. We can also temporarily protect machinery using dust covers etc.

We will ensure no damage is caused to your existing facilities whilst your new mezzanine floor is being installed.

Office Mezzanine Floor For Krone
Storage & Production Mezzanine Floor AJS

WHAT'S INVOLVED?

A TURN-KEY SOLUTION

There are many elements involved in constructing a mezzanine floor. Here at Nexus we offer a complete end to end solution that encompasses each and every aspect involved.

THE MEZZANINE STRUCTURE

Mezzanine floors are constructed from primary and secondary steels and finished with a chipboard deck. They are free standing structures that are independent from the building itself.

ELECTRICS

The minimum requirements of any mezzanine floor is the installation of  lighting and smoke detection. Also often included in most projects are power requirements. We offer a full electrical package as part of our solution and everything will be itemised on your quotation.

FIRE PROTECTION

If people will be working above or below the mezzanine floor, it will need fire protection to 60 minutes to comply with building regulations. We achieve this by installing a suspended ceiling, column cases and fascia to the exposed edges of the mezzanine floor.

The mezzanine floor will also need fire protection if the floor exceeds 50% of the footprint of the building or if it exceeds 20 metres in any direction.

OFFICE SPACE

If you require a mezzanine floor for office use, we can design and install each and every aspect of your new facilities for you. From the office partitioning and carpets through to the air conditioning, electrical and plumbing requirements. We’ll design the right solution for you and your business.

ANCILLARIES

There are a number of ancillaries to choose from to ensure your business runs smoothly once your new facilities are complete. From goods lifts and product chutes through to static or mechanical conveyers, we’ll design your new mezzanine floor facilities around you and recommend the right additions to your new space.

Mezzanine Floor at CDL
Storage Mezzanine Floor Handrails

WHERE WE WORK

We would love to be able to help create workspaces for businesses throughout the whole of the UK but unfortunately we can’t. The extra cost to you and the fact that we wouldn’t be able to manage your project to our high standards means that we must set a limit for how far we can work. The area we cover is highlighted to the right. As you can see, we essentially work as far North as Newcastle and as far South as Birmingham. So if your business is situated in an area we cover, get in touch today to discuss your plans for your new workspace.

GET A QUOTE
Nexus Where We Work

REGULATIONS,HEALTH & SAFETY

PRINCIPAL DESIGNER & CONTRACTOR

This is one of the biggest advantages of using a turnkey provider like Nexus. As a client you have a huge responsibility to fulfil your role as the client from a health and safety perspective. This is outlined by the Health and Safety Executive (HSE).

You, the client are obliged to appoint a ‘Principal Designer’ and a ‘Principal Contractor’. These rules are in place for any project that involves more than one contractor and are designed to protect yourself and contractors alike. Its really worth your time to read up on your responsibilities and understand them thoroughly before you commence with your project.

MEZZANINE CONSTRUCTION EXPERIENCE

We have implemented many projects and have extensive knowledge on how to safely construct a mezzanine floor safely and efficiently into a busy working environment. Our absolute priority is the health and safety of everyone involved with the project.

BUILDING REGULATIONS

A big part of a mezzanine floor construction project is ensuring that the project complies with building regulations. We work closely with an independent building control officer to ensure all our proposals conform with the requirements.

Typical considerations are travel distances to staircases, ensuring we provide suitable fire protection to the structure and ensuring smoke detection is implemented into the structure through the installation of smoke alarms. All of this is included within our proposal to you.

CLIENT TESTIMONIALS

Would I recommend Nexus to somebody else? Yes, absolutely, 100%. I can't praise them enough.

Michelle MansonDirector, Clip 'n' Climb

I can't really fault the process from start to finish. I was very impressed with the delivery of the project.

John CormackDirector, Move Dance

We just found the whole process amazingly simple and straightforward.

Iain ClasperManaging Director, Northern Flags

To be honest with you, it has been a very painless exercise working with Nexus.

Jean-Pierre NaylorDirector, CDL

We had great levels of communication with them and the finish has been to a very high standard.

Ben BlackburnManaging Director, Blackburn Distributions

The quality of the work at the end of the day is second to none. I really can’t say how happy I am with how the project has turned out.

David WilsonDirector, KW Digital

Their professionalism and expert knowledge really shone through, throughout the entire project.

Job BrownHead of Operations & IT, Green & Brown

They understood our brief and they understood the look that we were going for. It sounds daft, but it was almost a disappointment when they left.

Chris MorriseyManaging Director, Lily Comms
SEE WHAT OUR CLIENTS SAY
GET A FREE NEXTSTEPSTM QUOTE
Zak Lewis

Author Zak Lewis

More posts by Zak Lewis

Leave a Reply