First decide what you need to fund

Cash purchase, a business loan, hire purchase and leasing are all routes worth comparing. Finance can preserve cash at the start, but introduces future payments, charges and contractual obligations. A lower monthly figure does not necessarily mean a cheaper project.

Separate three decisions: is the project worthwhile, can the business afford it, and which funding agreement best fits its plans? Funding approval answers only part of the second question.

Build one complete project budget

A floor-only price is not the cost of a usable workspace. Ask for an itemised scope and record who pays for each element, when it is due and whether a funder will accept it.

  • Core works: structure, decking, stairs, guarding, partitions, ceilings and finishes, as applicable.
  • Supporting works: electrical supply, lighting, data, ventilation, heating, plumbing, fire protection and access arrangements identified by the design.
  • Professional and approval costs: surveys, design, structural checks, relevant applications and landlord requirements. Confirm inclusions with your project team.
  • Business costs: furniture, IT, stock moves, temporary accommodation, disruption, insurance and ongoing maintenance.
  • Cash allowances: VAT, a contingency linked to identified risks, and working capital until the space becomes productive.

Ask for two totals: the complete project cost and the amount eligible for finance. Labour, fees, building alterations and enabling works may be treated differently by each funder. “Full project funding” must be confirmed against the actual quotation.

Match the term to the premises

Compare the finance term with the remaining property lease, break dates and expected use of the space. If you leave early, the finance may still be payable. Ask your solicitor and funder about landlord consent, rights over installed assets, removal and reinstatement before committing.

For the scope behind the budget, see our mezzanine floors, office fit-out and warehouse fit-out services.

Which funding route fits your plans?

Start with ownership, cash available and flexibility. Then obtain written quotations for the same specification, financed amount and term. The British Business Bank’s asset finance guide explains leasing and hire purchase; the comparison below applies those choices to a premises project.

On a small screen, scroll the comparison sideways.

Compare the commitment, not just the monthly payment
RouteWhen to consider itWhat to check
Cash purchaseYou want ownership and have sufficient surplus cash after retaining operating reserves.No borrowing interest, but substantial cash leaves the business. Check staged invoices, VAT timing and whether cash is needed for stock, payroll or growth.
Business loanYou want to purchase the works and repay borrowing separately, potentially covering a mixed scope.Eligible purpose, fixed or variable interest, security, covenants, guarantees and early repayment charges. Ownership remains subject to purchase terms and any lender security.
Hire purchaseYou want a route to ownership of funder-approved assets through instalments.Deposit, VAT cash requirement, interest, final or option-to-purchase fee and the exact conditions for title to pass. You do not usually own the asset during the agreement.
Finance leaseYou want use of funder-owned assets while spreading rental payments.Initial rental, primary term, maintenance and insurance duties, then return, continued rental or other agreed end arrangements. Do not assume ownership transfers or that returning a fitted asset is simple.
Phased delivery or mixed fundingYou can split the works into genuinely usable stages, or finance eligible assets and pay other costs in cash.Repeat mobilisation, disruption, interfaces and approvals. A cheaper first stage can raise total cost or delay the benefit.

There is no universal best route. A longer term can ease monthly payments while increasing total cost and extending the commitment beyond your planned occupation. Ask for both the total payable and a schedule of every payment.

Tax, VAT and accounts: check three different things

These are UK considerations, not a promise of relief. Your legal entity, tax position, accounting framework, asset classification and contract all matter. Have your accountant review an itemised quotation and the proposed agreement.

1. Tax relief is not a refund of the project price

A deductible cost reduces taxable profit; it does not normally reduce the tax bill pound for pound. The value and timing depend on your taxable profits and applicable rules. Avoid comparing options using an assumed “100% tax saving”.

For qualifying plant and machinery bought using hire purchase, AIA can apply when the item starts being used, including capital payments still to be made; interest is excluded from that AIA claim. Eligibility, limits and the accounting period still matter. See HMRC’s Annual Investment Allowance guidance.

Do not treat an entire mezzanine or fit-out invoice as one tax category. Ask your adviser to distinguish equipment, fixtures, integral features and building or structural expenditure. Lease deductions also need contract-specific advice; no blanket tax treatment is assumed here.

2. VAT timing changes the cash requirement

Ask how much VAT must be paid, to whom and when. A hire purchase transaction treated as a supply of goods can bring a VAT requirement at the start; leasing services generally attract VAT on instalments. Contract labels alone do not determine the treatment. HMRC explains the distinction and exceptions.

Being VAT registered does not by itself establish full recovery. Ask your accountant to confirm recoverable VAT, evidence required and expected recovery dates. Include the temporary funding gap—and any irrecoverable VAT—in your cash forecast.

3. Leasing does not automatically keep debt off the balance sheet

For accounting periods beginning on or after 1 January 2026, revised FRS 102 requires lessees to recognise right-of-use assets and liabilities for most leases, with exemptions. Other accounting frameworks can differ. Check the effect on your accounts and banking covenants with your accountant. Read the FRC’s explanation of the changes.

Open plan office at Move Dance with glazed meeting rooms and ceiling light tunnels
Budget for the finished space. Nexus’s Move Dance project included offices, meeting rooms and supporting facilities. The published project account shows why a fit-out budget extends beyond a mezzanine structure. This is scope evidence, not a finance or cost example.

Illustrative arithmetic / Not a finance offer

Make a monthly quotation mean something

Suppose an eligible project has a cash price of £100,000 excluding VAT. An invented quotation asks for £10,000 upfront, followed by 60 monthly payments of £1,900 and a £250 fee. Assume no additional final payment for this exercise.

£10,000 + (60 × £1,900) + £250 = £124,250

That is £24,250 above the cash price, before VAT and tax effects. It is a comparison of cash payments, not an APR or a market rate. A real lease may include further rentals or return costs, and a real hire purchase agreement may include a final ownership fee.

Now test affordability separately

Suppose the project produces £3,000 a month of additional cash contribution after extra operating costs, before finance. The £1,900 payment leaves £1,100. If that contribution is 40% lower, it becomes £1,800 and the project is £100 short each month. The business still owes the payment.

If benefits are delayed by three months after payments start, allow £5,700 for those payments alone, plus any operating shortfall. Revenue is not cash contribution: deduct extra staffing, energy, maintenance and other costs, and allow for when customers actually pay.

Decision test: prepare a monthly whole-business cash forecast through installation and ramp-up. Test slower sales, late receipts, a cost overrun and delayed opening. Keep a minimum cash reserve for payroll, tax and suppliers. If the downside case breaches it, change the scope, timing or funding before proceeding.

Before signing: get these answers in writing

  1. Exactly what is funded? Match the asset list and supplier quotation. Identify exclusions, deposits already paid and any condition that prevents reimbursement.
  2. What is the entire payment commitment? Record initial rental or deposit, number and frequency of instalments, VAT, fees, balloon or final payment and end-of-term costs. Confirm fixed or variable pricing and quote expiry.
  3. When does the money move? Align supplier milestones with lender release conditions. Confirm who funds deposits, whether stage payments are available and when rentals begin.
  4. What triggers acceptance? Understand any delivery or completion certificate before signing it. Check how incomplete work, defects, delays and variations will be handled between supplier and funder.
  5. What is at risk? Identify security, personal guarantees, insurance, maintenance obligations and default consequences. Get independent advice before giving a guarantee.
  6. How does it end—or end early? Request a settlement example, cancellation terms, ownership conditions and return or reinstatement obligations. Returning equipment does not necessarily clear the debt.
  7. Who are you dealing with? Identify the lender, broker or introducer, any fees or commission and the complaints route. Compare an alternative quotation where practical.

Check a firm’s identity, contact details and relevant permissions using the FCA’s checking guidance. Authorisation is not an endorsement of an agreement. Business finance protections depend on the borrower and product; GOV.UK explains why business-to-business lending and consumer credit differ. Ask what protections apply to your specific agreement.

Prepare a useful enquiry

A lender or broker may request accounts, recent management figures, bank statements, existing borrowing and a cash forecast. Requirements and approval times vary. Prepare the project specification, supplier quotation, site tenure, desired term and ownership preference first; ask for the provider’s secure submission process before sending financial documents.

Nexus can help establish the project scope and quotation. Confirm any current finance introduction arrangements directly with our team. Availability, eligibility and terms require a provider’s assessment; this guide does not promise acceptance or a particular rate.

Take a better brief to your next meeting

Use this worksheet before speaking to your project team, accountant or finance provider. Complete the budget first, then make a copy for each funding quotation. Keep every comparison on the same VAT basis and check that upfront payments are not counted twice.

Download the planning worksheet (TXT)

Free · No registration · Plain text: open, edit or print in any text editor. Blank planning template; no automatic calculations or finance recommendations.

Your meeting checklist

  • Outcome: what capacity or working problem must the project solve, and by when?
  • Premises: location, lease expiry, break date, consents and removal duties.
  • Budget: complete cost, eligible finance amount, VAT gap and contingency.
  • Comparison: upfront cost, every payment, total payable, ownership and exit cost.
  • Affordability: downside cash balance, minimum reserve and how a delay is funded.
  • Decision: named approvers, unanswered questions and conditions to resolve before signing.

Questions people ask

Can the whole fit-out be financed?

Possibly, but eligibility is specific to the funder and scope. Obtain written confirmation covering structure, fit-out, installation, professional fees and enabling works. Plan a cash budget for exclusions and any deposit or VAT gap.

Will I own the mezzanine at the end?

Check the agreement. Hire purchase usually provides a route to ownership after the required payments and any purchase fee. A finance lease usually leaves ownership with the funder; continued use and end arrangements must be agreed. Property and fixture issues also need legal review.

What will my monthly payment be?

It depends on the financed amount, deposit, term, credit assessment, product, fees and end payment. Request a current written quotation after the project scope is defined. Historic monthly examples are not reliable evidence of today’s terms.

From planning to a clear project scope

Start with a project you can price properly.

Tell Nexus where your premises are, what needs to change, your target date and any budget or cash-flow constraints. We can discuss the scope and next steps for a project quotation. Bring the worksheet to that conversation.

Discuss your project ↗

Explore our delivery process or completed Nexus projects. Speak to your accountant and an appropriate finance or legal adviser about the proposed funding agreement.

Zak Lewis

Author Zak Lewis

More posts by Zak Lewis

Leave a Reply