Understand what the principal designer and principal contractor do, when the CDM appointments are needed and what to ask before work begins.

Discuss your project team

Reviewed 16 November 2026

Mezzanine structure above an enclosed workspace
Design decisions and construction planning need to connect.

01 · Get the roles right

Start with the actual project team.

A storage mezzanine project can involve structural design, installation, electrical work, fire provisions and specialist handling equipment. The fact that you have one main commercial contact does not necessarily mean there is only one contractor.

Under CDM 2015, a project involving more than one contractor requires a principal designer and principal contractor. For a commercial project, the client should make the required appointments in writing and ensure the appointees have the capability for the work. These appointments do not remove the client's own responsibilities.

Our commercial client guide explains the wider brief, information and management arrangements.

02 · Before and alongside construction

The CDM principal designer.

The principal designer coordinates health and safety in the pre-construction phase. This includes helping bring together relevant information, coordinating designers and addressing foreseeable risks through design, while keeping the principal contractor informed.

For a mezzanine, the important conversations may include how the structure will be erected around existing equipment, how access will work and what information is needed about the building. Design coordination can continue while construction is under way.

This is not simply a different name for the structural engineer, nor a guarantee that one person performs every design task. Confirm who undertakes each design package and how their work is coordinated. See HSE's principal designer guidance.

03 · During the build

The CDM principal contractor.

The principal contractor manages and coordinates health and safety during the construction phase. Responsibilities include preparing and maintaining the construction phase plan, coordinating the work, suitable site induction and welfare arrangements, and preventing unauthorised access.

In an occupied warehouse, this role needs to connect with the client's normal operations. The build plan should address the interface with staff, visitors, vehicles, deliveries and any activities that must continue.

A statutory role is not the same as a promise that a project cannot run late or incur changes. Programme, cost and commercial responsibilities should also be clearly stated in the agreed scope. Read HSE's principal contractor guidance.

04 · Avoid gaps between packages

The hand-offs matter.

Design to site

How are design decisions and remaining risks communicated to the installation team? Who checks a proposed change before it is made? What information is still outstanding?

Site to the business

Who agrees access restrictions, shutdowns and deliveries with your team? How are changes explained to warehouse staff? Who authorises an area to return to normal use?

In England, building regulations also use principal designer and principal contractor roles for building-regulations compliance. These are distinct from CDM health and safety roles. Make the relevant appointments and scope explicit rather than assuming one title covers everything.

For that separate process, see our mezzanine regulations guide.

05 · Questions before you commit

Ask for a clear responsibility schedule.

  • Who is appointed to each required role, and under which regime?
  • What experience and capability are relevant to this project?
  • Who supplies and coordinates the structural and other design information?
  • Who manages the interface with your ongoing operations?
  • How are design and scope changes reviewed and recorded?
  • Who is responsible for each approval, inspection and handover item?
  • What information will you receive for future operation and maintenance?

Make sure these answers match the quotation and appointments. A clear schedule helps you compare proposals and prevents important work from falling between packages.

Common questions

Project role FAQs.

Can one organisation fulfil both CDM roles?

Potentially, if it has the necessary capability and is properly appointed. The responsibilities still need to be carried out; combining appointments is not a shortcut around them.

Does a small mezzanine avoid these requirements?

Size alone is not the test for the CDM principal appointments. Consider whether more than one contractor is involved and take appropriate advice on the project arrangements.

Can Nexus explain the proposed appointments?

Yes. Discuss the scope and project team with us so the services and responsibilities can be set out clearly before you commit.

General guidance for commercial projects. Confirm the applicable duties and appointments for your circumstances with the relevant professionals.

For a practical project brief, see our storage mezzanine floors service. When comparing mezzanine floor companies, ask which design, construction and coordination responsibilities each proposal includes.

Clarity before construction

Build the team around the project.

Share the intended use, site constraints and scope. We will help you identify the next steps for a coordinated mezzanine project.

Talk to Nexus Workspace