MANCHESTER MEDICAL CENTRE FIT OUT PART 2 - PROJECT UPDATE

It’s the last day on site for our medical centre fit out project in Manchester. The project has taken eight weeks and the transformation from when we last provided you with an update has been fantastic.

The project has come along nicely and it’s nearly ready to hand over to our client. From next week, the local community will have a state of the art, modern medical centre serving it. Our client required a full fit out across the whole first floor of the building. The floor was previously an empty shell that was stripped bare to the breeze block and had no ceilings.

The premises were identified as an ideal location for the new medical centre and they contacted Nexus and invited us in to discuss their requirements. We had worked with them on previous occasions so had already built up a relationship which is an important aspect in any project.

They required a contractor that could provide them with a full turn-key solution, encompassing each and every aspect of the fit out. We visited site to survey the space and capture all the information we needed to allow us to design the layout of the new medical centre.

Once the drawings were complete, we sent them across to the client for approval. Once they were approved we put together a project plan which has now been implemented completely. There are a variety of elements that make up the fit out.

For example, we are installing partitioning to create all the new rooms, including soundproofed walls for the consultation rooms to ensure conversations are kept private. We are also installing folding partitions to one room to allow it to be split into two at any time. 

The new space will comprise of a reception, waiting area, a kitchen space for employees and numerous consultation rooms.

WC facilities are being installed for both staff and visitors, meeting all DDA regulations, whilst we are also taking care of the installation of air conditioning systems and all plumbing and electrical requirements.

With the centre opening next week, the project needed to be finished on time and today it is coming to a close. So if your business requires a fit out within your premises, whether that’s a current building or you are moving premises, give us a call today and we’d be happy to help.